GAME ON
How colleagues work together to keep London moving on busy matchdays
Some of the UK’s largest arenas, hosting major sporting and music events, are on our network.
That means it’s vital we have strong processes in place to handle the tens of thousands of extra customers that pass through on match and concert days.
A number of those venues boast capacities in excess of 60,000 visitors. Tottenham Hotspur Stadium is one of these, and a sizeable proportion of their event goers pass through White Hart Lane and Seven Sisters stations. The same is true for events at West Ham’s London Stadium for Stratford and Hackney Wick stations.
Meanwhile, although Selhurst Park, home of Premier League football club Crystal Palace, is less than half the size, it still means thousands of additional customers travelling through Norwood Junction every couple of weeks on average.
The safety of our customers and staff is our biggest priority, which is why we have resilient and flexible plans in place before, during and after such major events, to help manage and prevent issues like overcrowding of platforms and trains.
Ian Ross
Ian Ross
“When we start planning for a major event at Tottenham Hotspur, we assume it will be a full house, so basing everything around an expectation of 60,000 people,” says Ian Ross, senior planning specialist.
“The next thing is to ensure that we set all trains to be eight cars long, effectively doubling the capacity of each from 500 to 1,000 customers. If it’s at the weekend, we run those longer trains all day as people’s journeys may be more spread out.
“We also increase the times each train waits at the platform, going from 30 seconds to three minutes, which gives people more time to get on as safely as possible, and update the train times to reflect this.”
continued
Ian adds the planning team will also, if possible, run an additional two trains per hour – so up to six per hour in each direction – during major events, which increases further for a so-called ‘golden hour’ immediately after each event ends.
“When we know the time the event is ending, it means we can run seven or eight trains tightly spaced for that hour,” Ian explains.
“It’s all about doing everything we can to move as many customers through the stations as quickly and as safely as possible.”
It’s here that our colleagues on the ground play a key role. One of those is Shelton Shaw, a frontline customer service assistant based at Hackney Wick, who regularly takes on event lead duties for London Stadium events.
Shelton Shaw
Shelton Shaw
He reveals how the team maintains almost constant communication around and during big events.
“After making sure everything is in place at my station, I travel to Stratford for a big meeting with the different train and underground operators, British Transport Police and the Metropolitan Police,” he says.
“There we discuss all the plans we have in place, how many people we’re expecting and what police support is needed – for football matches, lower-category games will only have a minimal police presence, but higher-category games will have a far greater one.”
continued
With that meeting concluded, Shelton travels back to Hackney Wick to make final checks that everything is in place ready for the big influx of customers.
Then, once the event has begun in the stadium, it’s back to Stratford for another meeting. “It’s there we update on passenger numbers and any issues that need to be dealt with,” Shelton says.
Returning to Hackney Wick, he then briefs the rest of the team about what to expect after the event has concluded, including using barriers to create a queueing system outside the station entrance to help control the numbers on the platform at any one time.
Matthew Hayes
Matthew Hayes
Another who takes on an event lead role is Matthew Hayes, service delivery resilience manager, who monitors what’s happening during a football match to help prepare for what happens after.
“I keep a close eye on the score, as if it’s a big loss for West Ham, for example, it means people may start leaving the stadium, and arriving at the station, earlier than expected,” he says. "On the other hand, if it’s a cup game that ends up going to extra time and penalties, it means the main rush of customers will be delayed, potentially by half an hour or more.”
Matthew reveals another useful way of managing the flow of customers into the station to avoid platform overcrowding is deactivating one of the ticket barriers.
“If I spot a cyclist bringing their bike into the station, which takes up as much room as three or four customers, I’ll also have a quick word with them to advise delaying their journey if possible due to the crowds,” he adds.
“If anything goes wrong we would have a post-event debrief at Stratford to discuss how to improve in the future, but I can’t remember that ever needing to happen. In my experience it’s all always run very smoothly.”
continued
Being aware of potential issues and resolving them before they become bigger problems is one of the responsibilities of our Control team.
“When you operate a rail network and stations, any one of a number of things can go wrong, whether that’s a breakdown of a train or infrastructure, people trespassing on the tracks or colleague absences,” explains Philip Sargent, senior network lead.
Philip Sargent
Philip Sargent
“But when you have a major event involving thousands of additional customers in a short period of time, the chances of something occurring rise significantly and the impact is more widely felt. Even something as simple as a crowded train being delayed slightly due to blocked doors being unable to close can have a big knock-on effect on the rest of the network. It’s an interconnected system, and one late train can easily delay many others.”
In such cases, making up time by running trains faster can get things back on track, but not if the train is full and standing. Communication is once again key.
“We share information with National Rail and TfL so their websites and apps can give customers real-time updates on departure times and delays, and alter their travel plans accordingly if need be,” Philip says.
“To help us stay on top of what is happening, at all times but particularly during major events, it’s important we work closely with our station teams. Their information is vital in influencing how we manage train services and our train running updates are vital for their operation of the station.
“Just being aware of an event’s finish time can be essential for us, as it gives us a definitive window in which to recover from earlier delays in time for customers wanting to return home quickly and safely after a hopefully fantastic experience.”